| Sign In | Join Free | My fnxradio.com |
|
Brand Name : JOINTECH
Model Number : JT705A
Place of Origin : Guangdong, China
MOQ : 1
Price : USD 548
Payment Terms : T/T
Delivery Time : 5-8 work days
Product Description for Jointech JT705A Anti-Tamper GPS Electronic Seal Padlock
JT705A, an intelligent electronic GPS padlock with high security, it can be installed on container door, truck door, trailer to
monitor location, door status and vibration value.
26500mAh rechargeable battery, one location data per minutes, it can last for more than 50 days.
It is widely used in container, van truck, trailer transportation monitoring and warehouse door monitoring
It is popular with end users of government and customs departments, logistics companies, manufacturers, supermarkets, carriers and financial institutions.
Product Specification for Jointech JT705A Anti-Tamper GPS Electronic Seal Padlock
| Parameters | Host Machine Sizes | 223mm*130mm*53mm |
| String Longitude | 450mm | |
| Weight5 | KG | |
| Working Temperature | -20°C -- 70°C | |
| Storage Temperature | -40°C -- +85°C | |
| Relative Humidity | 5%-99% | |
| Charging Voltage | 5V | |
| Operating Current | Main-Board Average Current<120mA Main-Board Standby Current<4mA | |
| Battery Capacity | 30000mAh | |
| GPS Antenna | Built-in | |
| 2G Antenna | Built-in | |
| SIM Card Slot | Micro SIM Card | |
| Indicator | GPS,GSM,Charging 3 LED Light |
Product Features for Jointech JT705A Anti-Tamper GPS Electronic Seal Padlock








Jointech is a leading provider of asset tracking and monitoring solutions.
We offers a wide range of products, including GPS trackers, electronic locks, and asset monitoring systems.
Jointech serves a variety of industries, including customs, logistics, transportation, supply chain management and so on.
Yes, Jointech offers customized solutions tailored to the unique needs of its customers in various industries, such as construction, transportation, and logistics.
The warranty period for products is typically 12 months.
The lead time for products depends on the specific product and order quantity.
Yes, we can provide samples upon request.
We has a strict quality control system and all products undergo rigorous testing before shipment. We also welcome you visit our company to check.
Jointech's asset tracker is a small, battery-powered device that provides real-time location data for non-powered assets such as trailers and containers.
Our vision is connect global mobile assets intelligently.
|
|
Jointech JT705A High Security GPS Electronic Seal Padlock with 50 Days Battery Life and Real-Time Location Monitoring Images |